Wire Belt Company of America recently expanded their solar array by 50 kW (kilowatts), totaling the array to 150 kW. The addition was installed in June and can be expected to go live in mid-to-late August. The new array was placed on the new addition of the building that opened in November of 2013.
“We are always trying to reduce our reliance on fossil fuels and become energy independent,” said David Greer, CEO of Wire Belt. “The expansion of the system brings us closer to that goal.”