Fisher Construction Group was named the winner of the International Association for Cold Storage Construction (IACSC) Built by the Best Award for their project with Lineage Logistics and Titan Frozen Fruit.
Lineage Logistics contracted with Fisher Construction Group to build a 216,777 sq.ft. LEED certified facility, which includes 151,000 sq. ft. of cold storage and dock space, and 65,000 sq. ft. dedicated to onsite food processing for Lineage's tenant Titan Frozen Fruit. Fisher developed solutions to challenges during the construction of the LEED-certified facility, at times managing over 120 workers in 10 trades, to allow Titan Frozen Fruit to start processing strawberries just seven months after ground breaking.