Viking Cold Solutions, a leading thermal energy storage provider for low-temperature cold storage industries, has completed the installation of eight Thermal Energy Storage (TES) systems as part of a utility-backed demand management program in Massachusetts. These eight behind-the-meter TES systems store and facilitate management of approximately 1.3 megawatts (MW) of energy onsite, and do not require any additional real estate for the system components. The average size of the cold storage facilities in the program is approximately 50,000 square feet, with the largest being 157,000 square feet.
Installation time averaged 127 days from agreement to commissioning and removal of demand from the grid. The Greater Boston Food Bank was the first TES installation of the demand management program, which also includes industrial facilities owned by the world’s largest third-party cold storage company, the world’s largest foodservice distributor, and numerous frozen food processing companies.